On Tuesday my class and another went into the hall and did the E pro 8 building challenge where we had to use teamwork, problem solving, and engineering skills to build the criteria in our books. First we watched an example video and while we were watching it my leg fell asleep and I couldn’t feel it for a while. When we got put into our groups I wasn’t really surprised as I’m always in a group with the exact same people, Te aria and Leo (and Karlos but he left after break one). We did a warmup challenge for the first two periods to learn how the pieces we would be building with worked and what the building would be liked. We had an assortment of screws, joining pieces, wheels and ropes to fiddle with but not break because everyones equipment altogether was worth roughly $16’000. When we finished the warmup challenge we had to pack it all up which always takes a while then we went out to break. When we came back the real challenge began.

The next two periods were spent constructing a crane that had to be functional and 1.8 metres tall at the minimum. It was a huge challenge and all three of us had to co-operate and work very hard. We made lots of mistakes and had to tear stuff down at times because one screw or rod was in the wrong place.We continued this building all the way until the very last period of the day and we got very close to finishing but we didn’t because we were missing a team member which slowed us down. We had assigned eachother roles to make working together easier like me building it higher and working on the actual building while Te Aria and Leo were making the crane stable and functional. We had to pack up all our hard work at about 10 to 3 which took far too long because we had so many screws and pieces making our building rigid.

On Thursday my friends were redoing the E pro 8 because they had bad team members so they needed another team member to fill in for the one they didn’t want to work with. My friend was sent to go get me to build with them. This time we only had 2 periods and lunchtime to finish our building. The criteria for this challenge was to build a bridge atleast 2.5 metres long and can let a 70cm boat pass underneath it. The legs of the bridge had to be not touching the “water” from the river and a 4-wheel car had to be able to be pulled over it. Me and my friends worked hard to build the bridge and we made a lot of mistakes along the way and had to fix a lot. In the end we finished at 10 past and the was the end of my E pro 8.

Read more

Comments are closed.

Powered by WordPress.com. Theme: Baskerville 2 by Anders Noren.

Up ↑