We are digging a trench 400 mm wide and 400 mm deep to help direct water away from the running track. We are using tools such as spades, shovels, pickaxes, wheelbarrows, rakes, and a hoe. Through this task, we are learning how to choose the best tools for each part of the job, how to use them safely and effectively, and how to manage water flow to prevent the track from washing out.