Week 3 learning

This week has been a hands on work as our yr 13 group have been working through completing our outdoor seats finally being able to take up to the Gym and assemble our seats together. Our group worked through some problem solving while attaching the seat together and look at how the seat would look once it was fixed. There was some trail and error and realised as we were reaching the end of completing our seat our socket that was 17mm had a space of 10mm instead of 1/2 space, so we went to hammer hardware to purchase the correct size and fitting to bolt in our masonry bolts and screws that would be attached to the seat and the concrete wall to have another strength of bracing.

Down below are some photos of our seats being measured, cut, drilled, screws being put in and clamps to help make the job easier. I had enjoyed doing this little project with the other yr 13’s that include the help from Jerome, Dale, Wiremu, Nigel, Te Waipuke and a helping hand from Mana when we took our long length of timber to the Gym.

Read more

Comments are closed.

Powered by WordPress.com. Theme: Baskerville 2 by Anders Noren.

Up ↑