paving unit part 3

Last week we delivered finely crushed scoria to level the ground in preparation for paving. The material was spread across the entire area within the former deck footprint, and most of the surface was successfully levelled. However, we ran out of scoria along the left hand side, so that section still needs to be topped up and levelled to match the rest.

Read more

Comments are closed.

Powered by WordPress.com. Theme: Baskerville 2 by Anders Noren.

Up ↑